QA practice8 min readUpdated 2026-11-23By

How game QA outsourcing works: builds, test passes and certification

Game QA outsourcing is a loop of build drops, test passes and platform submission. A vendor can run functional, compatibility, localization and compliance passes against each build, and the platform holder's own review decides release. For Xbox, Microsoft's stated service level for requirement testing of a digital base final submission is 4 business days ev-content-gameqa-001confidence A, so the outsourced schedule should end before submission, not inside that window.

On this page
  1. Build cadence sets the rhythm of every pass
  2. Four test pass types, and what each one needs
  3. What Xbox, Steam, Apple and Google publish
  4. A seven-step sequence from build drop to release
  5. What this process does not tell a buyer

Build cadence sets the rhythm of every pass

A game QA engagement can be organized around builds, not around tickets. The studio produces a build, the vendor tests it, and defects return to the studio before the next build is cut. How many testers are needed on a given day then follows from how often builds arrive and how stable they are.

This article uses three build types as a working frame: a daily or nightly build, a milestone build and a release candidate, the build intended to ship. Ask for a smoke check (a short test that a build installs, starts and reaches its main loop) on the first, a full functional pass on the second, and compatibility, localization and compliance work on the third before it goes to the platform holder. None of the platform documents read for this article defines these types, so they are contract choices. The same goes for the steps further down: each is a contract choice unless its label names a published rule, and the steps are written as instructions to a buyer.

Agree in the statement of work on turnaround per build type, not a single "response time". A smoke result needed within hours and a release candidate report needed within days are different staffing demands, and a vendor can plan shifts around them only if the build calendar is shared in advance. The pilot project design article covers how to trial that calendar before a long contract.

Build stability also decides whether testing can happen at all. Microsoft reports that Title Stability test case failures account for 38% of console certification failures and 34% of PC failures, and that Title Integrity failures, where a title is not functionally complete and testable, account for another 14% of console failures and 4% of PC failures ev-content-gameqa-006confidence A. These are the defects a vendor's pass would meet first, so agree also what happens to billed time when a build is not testable.

Four test pass types, and what each one needs

Game testing is often described as functional, compatibility, localization and compliance passes, and this article uses those four as a working frame, not as an industry standard. Two ranked vendors describe game work in different terms. One lists Functionality QA, Compliance QA, Compatibility QA, Localization and Localization QA among its games QA services ev-testronic-service-006confidence B. A second reports more than 600,000 tests over 9+ years for a developer of social online games ev-a1qa-case-001confidence B. Ask any game QA proposal to say which passes it covers.

A functional pass can cover modes, progression, saves, achievements, in-game purchases and online features; set that scope in the statement of work. Microsoft's examples of Title Integrity failures show what stops testing on Xbox: game modes that cannot be completed, leaderboards that do not populate and input modes that do not work ev-content-gameqa-006confidence A.

A compatibility pass checks the same build across hardware and settings. On PC, Microsoft says its certification team tests title stability across five resolutions, in windowed and full-screen modes, on a mix of AMD, Intel and Nvidia graphics hardware ev-content-gameqa-007confidence A. It also says defects have appeared after installing from the store that did not appear when side-loading (installing a build directly, outside the store) in a developer sandbox (a test environment that mimics the store without publishing to players) ev-content-gameqa-007confidence A. Ask a vendor's test plan to name the install path, not only the device list.

A localization pass checks translated text, audio and layout inside the build. The Xbox rule here is narrow: it sets no minimum amount of localization, but requires text to be legible regardless of display setup and tests additional features in all supported languages ev-content-gameqa-008confidence A. A LQA (localization quality assurance, testing of translated text, audio and formatting inside the game build) pass can be scoped to the languages the studio ships. The game QA talent article looks at what game testing sources show for Warsaw and Katowice.

A compliance pass, as this article uses the term, is a check of the build against a platform holder's published rules before submission. Each platform holder publishes its own rules, which the next section reads.

What Xbox, Steam, Apple and Google publish

Microsoft's certification guide describes three stages: submission checks, BVT (build verification testing, a reduced test pass that confirms a title is testable before full certification testing is scheduled), and requirement testing ev-content-gameqa-002confidence A. All products must pass BVT before full certification testing is scheduled, so ask a vendor to build its own smoke pass around the same areas.

The same guide separates optional submissions, a paid service that returns a report but no pass or fail decision, from final submissions, where a fail report lists CFR (Condition for Resubmission, a title-failing issue that must be fixed before resubmitting) items ev-content-gameqa-003confidence A. Its stated SLA (service level agreement, here the target times Microsoft states for XBOX Requirement testing) values are 5 business days for disc submissions, 4 for digital base final and 2 for a digital content update, with 48-hour and 24-hour Fastlane (Microsoft's name for its shorter-turnaround options) for the last two ev-content-gameqa-001confidence A. A submission can also be placed on hold when testing is blocked, and Microsoft lists missing or non-functioning partner accounts, partner services that do not support the certification sandboxes, and multiplayer not working as expected among the common reasons ev-content-gameqa-004confidence A. Agree in the statement of work who checks that those services are ready.

Two Xbox test cases map directly to vendor work. After suspend, sleep or hibernate the game must not crash, hang, fully restart or lose save progress, and must re-establish online connections, and a content-updated game must load a save made before the update ev-content-gameqa-009confidence A. Ask a vendor to include both checks in a regression pass.

Steam's rules concern the build and the store page. Valve recommends submitting a store page at least 7 business days before the wanted live date, says each platform listed on the store page needs a working build with its own launch option, and says reviewers check that every feature listed in Supported Features works in the build ev-content-gameqa-010confidence B. For Steam Deck compatibility Valve requires a completed standard build review first, and its display checks include a smallest on-screen font of not less than 9 pixels in height at 1280x800 ev-content-gameqa-011confidence A.

On mobile, Apple's guidelines require on-device testing for bugs and stability before submission, demo account information for any login, and complete, reviewer-visible, functional in-app purchases ev-content-gameqa-012confidence A. They also require disclosure of the odds for randomized paid items before purchase ev-content-gameqa-013confidence A. For pre-release testing, Apple's TestFlight allows up to 100 internal and 10,000 external testers, a build can be tested for up to 90 days, and the first build added to a group is sent to App Review ev-content-gameqa-014confidence A. Google Play allows internal tests of up to 100 testers per app, closed-test email lists of up to 2,000 and open tests that are unlimited or capped at a limit of at least 1,000 ev-content-gameqa-015confidence A. The gaming ranking page covers Apple review times and the Google Play target API level rule, which this article does not repeat, and the mobile testing ranking qualifies mobile testing vendors.

A seven-step sequence from build drop to release

The sequence below joins the build cadence, the four passes and the platform rules into one order of work. Each step is labeled. A "published rule" step points to a platform document read above. A "contract choice" step is a practice to agree with a vendor, and no record shows it is how the industry works.

  1. Agree the build calendar and the platform list (contract choice)

    Agree in the statement of work which build types arrive on which days, which platforms ship, and on which day the release candidate arrives. Each platform adds its own rules, so the platform list decides which later steps apply. Ask the vendor to plan its heaviest passes from the release candidate date.

  2. Run a smoke check on every build (contract choice)

    Ask the vendor to confirm that each build installs, starts and reaches the main loop. On Xbox, the platform holder runs its own version of this idea before full testing, described above. Ask that a failed smoke check be returned with the build identifier within an agreed time.

  3. Run functional passes against the milestone feature list (contract choice)

    Ask testers to work through modes, progression, saves, purchases and online features, and to log defects with build number, platform and reproduction steps. Ask that defects that stop other passes be flagged first.

  4. Run compatibility on the release candidate (published test practice for PC)

    Test the same build across the hardware, resolutions, install paths and settings the studio promised to support. For PC, a plan can name the install route and the display modes, following the combinations Microsoft says it tests, described above.

  5. Run localization on the frozen text (contract choice, with an Xbox rule)

    Ask language testers to check the shipped language set once text is frozen, so that a late string change does not force a retest of that language. The Xbox legibility and supported-language rules above set the floor for that platform.

  6. Run a pre-submission compliance pass (published rules)

    Have the vendor test against the platform's own requirement list and its known failure causes: for Xbox, the suspend and resume and save checks above; for Steam, the Supported Features check; for Apple, the on-device, demo account and purchase checks.

  7. Submit, wait and handle the return (published rule for Xbox, contract choice for the rest)

    Agree in the statement of work who submits and under whose platform account. Where a platform returns a list of conditions for resubmission, as Xbox does, ask the vendor to retest each listed issue on the resubmission build and to scope that retest as a defined pass, not an open-ended one.

What this process does not tell a buyer

The published sources describe the platform side, not what any Polish vendor does. The pages read for this article came from Microsoft, Valve, Apple and Google, so the sequence above does not describe PlayStation or Nintendo requirements. The same holds for how many testers a certification-ready pass needs, which no source in the evidence set states.

A vendor claiming console certification experience should be asked which platforms and which requirement lists it has worked against, and under whose agreement it has access. The guide to choosing a QA outsourcing company holds the general vendor questions; the questions specific to this process are about build turnaround per type, the languages tested by named people, and who owns the pre-submission checklist. In an RFP (request for proposal, the document a buyer sends to vendors), the template and scoring sheet holds the scoring rows, and the buyer's notes on those three answers sit beside the sheet. The methodology page lists what the ranking does and does not measure.

Questions buyers ask

Does an outsourced game QA team replace platform certification?

No. For Xbox, Microsoft runs certification testing itself, and a failed final submission produces a report of conditions that must be fixed before resubmission. An outsourced team can prepare a build by testing against the published requirements and the known failure causes, but it does not replace the platform holder's review.

Which test pass should start first on a new project?

A studio can start with a functional pass, because compatibility, localization and compliance results are more useful on a build that already runs through its main modes. That is this article's reading, not a published rule. The order is a contract choice, and a vendor can be asked to explain a different one.

Can a buyer see console certification requirements before signing a contract?

Xbox publishes its requirements and test cases on Microsoft Learn, so a buyer can read them. The public pages read for this article came from Microsoft, Valve, Apple and Google, and none was a PlayStation or Nintendo requirement page, so the buyer should ask the vendor to name the access it has under its own platform agreements.

Related guides and pages

Scores are computed from the published methodology using the evidence linked on this page as of the verification date shown. Rate bands are vendor-published or directory-listed ranges, not quotes. This site does not accept payment for inclusion, position or badges, and does not recommend any vendor outside the scenarios stated on the page.