Nearshore and location6 min readUpdated 2026-11-15By

Working with a Polish QA team from the US East Coast: a schedule that works

A New York team and a QA team in Warsaw share 2 hours of a 09:00-17:00 day, or 3 hours in the daylight-saving mismatch weeks ev-content-nearshore-003confidence B. A schedule that works treats the rest of the day as two shifts joined by four written handoffs. Outside the mismatch weeks the Warsaw day runs 03:00-11:00 New York time, so retests of last night's fixes reach New York before its first meeting ev-content-usschedule-001confidence B.

On this page
  1. Two shifts and one shared window
  2. A sample day with the handoff points marked
  3. The weekly schedule: Monday and Friday are different
  4. Mismatch weeks and one-sided holidays
  5. What the statement of work fixes so the schedule holds

This article turns the overlap figures into a sample day and a sample week, with each handoff point marked H1 to H4. The overlap tables themselves sit in the nearshore guide and, hour by hour, in the overlap tables article. Clock times below are conventions for a 09:00-17:00 day on both sides; a team with other hours shifts every slot by the same amount.

Two shifts and one shared window

The engagement works as a relay with a short live window in the middle. Warsaw is 6 hours ahead of New York outside the mismatch weeks ev-market-tz-037confidence B. The Warsaw day runs 03:00-11:00 New York time, and the New York day runs 15:00-23:00 Warsaw time, on 391 of the 412 days from 15 November 2026 to 31 December 2027 ev-content-usschedule-001confidence B.

The gaps between the shifts matter as much as the overlap. In normal weeks 10 hours pass between the end of the New York day and the start of the next Warsaw day, and 11 hours in the mismatch weeks ev-content-usschedule-002confidence B. That gap is where the nightly regression run (an automated rerun of existing tests to confirm that recent changes broke nothing) executes, on the build New York merged last.

In normal weeks Warsaw then has its first 6 hours alone, from 09:00 to 15:00 Warsaw time, which is 03:00 to 09:00 in New York ev-content-usschedule-001confidence B. In the mismatch weeks that solo block shrinks by an hour.

The design rule follows from that shape. Anything that needs a New York answer goes into writing before 15:00 Warsaw time, so the live window is spent on decisions, not on discovering the questions. Anything Warsaw needs by its next morning is asked inside the window or written before New York closes.

A sample day with the handoff points marked

The day below is built for a standard week and marks each handoff with its artifact. Every handoff is a written document in the ticket system or the team channel, with a fixed time and a named author. A missed handoff is visible the next morning, which a missed conversation is not.

  1. H1 at 09:00 Warsaw, 03:00 New York: Warsaw reads the New York handover

    The Warsaw test lead reads the handover New York wrote at its close (H4 of the previous day) and the nightly regression report. The lead sorts the day into three queues: fixes to retest, new features to test, and regression failures to triage. Questions for New York go into one list that grows through the morning.

  2. 09:00-13:00 Warsaw, 03:00-07:00 New York: solo testing block

    Testers retest the fixes delivered overnight, triage regression failures into product defects, test defects and environment problems, and start test execution on new features. Defects found here carry full reproduction steps, build number, test data and logs, because nobody in New York is at work to answer a clarifying question until 15:00 Warsaw time.

  3. H2 at 14:30 Warsaw, 08:30 New York: morning report posted

    Warsaw posts the report New York reads before its standup (a short daily meeting where each team member states progress and blockers): fixes confirmed and fixes reopened, new defects by severity, regression status of the current build, blockers, and the numbered question list. Each question names the person in New York who can answer it. New York reads Warsaw's results before its first meeting.

  4. 15:00-17:00 Warsaw, 09:00-11:00 New York: the shared window

    A short standup opens the window. The rest goes to one live slot per day (see the weekly table) and to answering the H2 questions in order. Defect reproduction with the developer who wrote the code happens here, because a failed reproduction by message costs a full day.

  5. H3 at 16:45 Warsaw, 10:45 New York: Warsaw closing handover

    The Warsaw lead posts what is in progress, which defects New York should pick up first, which answers are still open, and what build Warsaw expects to test tomorrow. Unanswered questions move to the next H2 with a flag, so they cannot quietly age.

  6. 11:00-17:00 New York, 17:00-23:00 Warsaw: New York solo block

    Developers fix, the product owner answers open questions in the tickets, and the team merges. Nobody in Warsaw is expected to respond. A severity-1 finding in production follows the escalation path in the contract, not the handoff cycle.

  7. H4 at 17:00 New York, 23:00 Warsaw: New York handover and nightly run

    New York posts the handover Warsaw reads at H1: builds deployed, fixes ready for retest with ticket links, changed priorities, answers to Warsaw's questions, and any scope change. The nightly regression starts on the last merged build, so its report is ready for the next H1.

The weekly schedule: Monday and Friday are different

A five-day week on both sides is not five identical days, because the weekend gap is long. Between the end of the New York Friday and the start of the Warsaw Monday, 58 hours pass on 56 of the 59 weekends from late November 2026 to December 2027, and 59 hours on the other 3 ev-content-usschedule-002confidence B. Monday's H1 therefore covers Friday afternoon fixes and a weekend of scheduled regression runs, and Friday's last Warsaw handoff, H3, arrives at 10:45 New York time.

The week below builds toward one release candidate (the build proposed for release, frozen so that test results apply to it) cut on Wednesday. Friday allows no release other than a hotfix (an urgent fix to production deployed outside the normal release cycle).

Sample week for a New York team and a Warsaw QA team (Warsaw time / New York time; clock times are conventions)
DayLive slot in the shared windowHandoff emphasisRelease activity
Monday15:15 / 09:15: test scope for the week agreed with the product ownerH1 covers Friday afternoon fixes and weekend regression runs; H2 carries a weekend summaryNone
Tuesday15:15 / 09:15: defect triage, highest severity firstH4 lists the features that will make the release candidateNone
Wednesday15:15 / 09:15: exploratory pairing on a new feature with the product ownerH4 names the release candidate build; nightly run is a full regressionRelease candidate cut by 17:00 New York
Thursday16:00 / 10:00: release go or no-go with the Warsaw test leadH2 is the release test report on the candidate buildRelease in the New York morning after the decision; Warsaw runs post-release checks until 17:00 Warsaw
Friday15:15 / 09:15: retrospective every second week; otherwise defect triageH3 includes a weekly quality summary; H4 lists what Warsaw tests first on MondayNo release; hotfixes only, with a named New York tester
Sources: ev-content-usschedule-001confidence Bev-content-usschedule-002confidence B

The release sits on Thursday for a reason the table makes visible. A Wednesday candidate gets a full nightly regression and a Warsaw morning of release testing before the decision at 10:00 New York time. A Friday afternoon release in New York starts after the Warsaw week has ended, so the first checks after it would wait until Monday.

Mismatch weeks and one-sided holidays

Twice a year the clock gap shrinks by an hour, and the schedule has to say which side moves. From 14 March to 28 March 2027, Warsaw is 5 hours ahead of New York instead of 6 ev-market-tz-040confidence B, and again from 31 October to 7 November 2027 ev-market-tz-041confidence B. In those weeks the Warsaw day runs 04:00-12:00 New York time ev-content-usschedule-001confidence B, and the overlap grows to 3 hours ev-content-nearshore-003confidence B.

The simplest rule anchors every live slot to New York time. H2 then moves to 13:30 Warsaw time and the standup to 14:00, while H1 and H4 stay fixed to each side's own clock. The Polish summer-time dates for 2027 still depend on a draft regulation that had status open on 9 November 2026 ev-market-tz-012confidence A, so the calendar entries for those weeks need a recheck once it is published.

Holidays break the relay more often than clock changes. On a one-sided holiday the working side runs a solo day: it writes its handoffs as usual, and the other side reads them on its next working day. The table lists one-sided and shared days from the US federal schedule ev-content-usschedule-003confidence A, the fixed-date Polish holidays ev-content-usschedule-004confidence B and the two movable Polish holidays that fall on 2027 weekdays ev-content-sitevisit-001confidence B. Polish 2026 dates come from the 2026 holiday list ev-market-tz-046confidence B.

Weekday holidays affecting a New York and Warsaw schedule, late November 2026 to 24 December 2027 (US column: federal holidays, which bind federal employees only)
DateUS federal holidayPolish public holidaySchedule effectSource
Thu 26 Nov 2026Thanksgiving DayNoWarsaw solo day; H2 and H3 read on Fridayev-content-usschedule-003confidence A
Thu 24 Dec 2026NoChristmas EveNew York solo day; H4 read on Monday 28 Decev-market-tz-046confidence B
Fri 25 Dec 2026Christmas DayChristmas DayShared day offev-content-usschedule-003confidence Aev-market-tz-046confidence B
Fri 1 Jan 2027New Year's DayNew Year's DayShared day offev-content-usschedule-003confidence Aev-content-usschedule-004confidence B
Wed 6 Jan 2027NoEpiphanyNew York solo dayev-content-usschedule-004confidence B
Mon 18 Jan 2027Martin Luther King Jr. birthdayNoWarsaw solo day after a weekend: Friday H4 is the last inputev-content-usschedule-003confidence A
Mon 15 Feb 2027Washington's BirthdayNoWarsaw solo day after a weekendev-content-usschedule-003confidence A
Mon 29 Mar 2027NoEaster MondayNew York solo day; the Monday H1 moves to Tuesdayev-content-sitevisit-001confidence B
Mon 3 May 2027NoConstitution DayNew York solo day; the Monday H1 moves to Tuesdayev-content-usschedule-004confidence B
Thu 27 May 2027NoCorpus ChristiNew York solo day; move the weekly release decisionev-content-sitevisit-001confidence B
Mon 31 May 2027Memorial DayNoWarsaw solo day after a weekendev-content-usschedule-003confidence A
Fri 18 Jun 2027Juneteenth (observed)NoWarsaw solo day; Thursday H4 is the last input before the weekendev-content-usschedule-003confidence A
Mon 5 Jul 2027Independence Day (observed)NoWarsaw solo day after a weekendev-content-usschedule-003confidence A
Mon 6 Sep 2027Labor DayNoWarsaw solo day after a weekendev-content-usschedule-003confidence A
Mon 11 Oct 2027Columbus DayNoWarsaw solo day after a weekendev-content-usschedule-003confidence A
Mon 1 Nov 2027NoAll Saints' DayNew York solo day inside a mismatch weekev-content-usschedule-004confidence Bev-market-tz-041confidence B
Thu 11 Nov 2027Veterans DayIndependence DayShared day off; move the weekly release decisionev-content-usschedule-003confidence Aev-content-usschedule-004confidence B
Thu 25 Nov 2027Thanksgiving DayNoWarsaw solo day; move the weekly release decisionev-content-usschedule-003confidence A
Fri 24 Dec 2027Christmas Day (observed)Christmas EveShared day offev-content-usschedule-003confidence Aev-content-usschedule-004confidence B
Sources: ev-content-usschedule-003confidence Aev-content-usschedule-004confidence Bev-content-sitevisit-001confidence Bev-market-tz-046confidence Bev-market-tz-041confidence B

The US column shows the federal schedule, which binds federal employees only; private employers set their own days off. A New York client therefore replaces that column with its own company calendar before the rows go into the shared calendar.

What the statement of work fixes so the schedule holds

Four contract items turn the clock times above into obligations, and vendor marketing supplies none of them. Vendor statements about time zones are general: one ranked vendor's directory profile lists Central European, US Eastern and Eastern European time as the time zones served ev-qa-madness-timezone-001confidence B, and another states a general commitment to clients' working hours without naming hours ev-elinext-timezone-001confidence B. Directory review highlights for a third note that some clients had difficulty scheduling meetings across time zones ev-deviqa-ver-004confidence A.

None of those statements names the hours. The SOW (statement of work, the contract annex that fixes scope, deliverables and service levels) does, with four items:

  • the latest posting time for H2 and H3 in Warsaw time and for H4 in New York time;
  • the fields each handoff must carry, so a thin report is a measurable miss;
  • the time zone that anchors each live slot during mismatch weeks;
  • who pays for any Warsaw session held after 17:00, and how often one may be requested.

A request for proposal template can carry these items as scored questions, so vendors answer them before signature. Vendor scores and the evidence behind them sit in the ranking, and the methodology explains how stated overlap commitments enter the nearshore fit score. The Poland and India comparison sets this relay against a model with no shared window, and the DACH article covers the same engagement for a team that shares Warsaw's clock.

Questions buyers ask

When does a QA team in Warsaw start work in New York time?

In the small hours of the New York morning, several hours before the New York team arrives. That head start is what lets a retest of last night's fixes reach New York before its first meeting.

Should a New York team release on a Friday with a Polish QA team?

Not on a Friday afternoon, because the Warsaw team has finished its week before the New York afternoon starts. A Thursday decision inside the shared window keeps a tester available for the release and the first checks after it.

What happens to the schedule when only one side has a public holiday?

The working side runs a solo day: it writes its handoff as usual, and the other side reads it on its next working day. Both sides mark one-sided holidays in the shared calendar at the start of each quarter.

Related guides and pages

Scores are computed from the published methodology using the evidence linked on this page as of the verification date shown. Rate bands are vendor-published or directory-listed ranges, not quotes. This site does not accept payment for inclusion, position or badges, and does not recommend any vendor outside the scenarios stated on the page.